Quick Menu
Phase II Views
Policies2007
S.No. Subject Letter No. Download
1. USE OF CPVC/GI/COMPOSITE PIPES IN PLUMBING SYSTEM-MAP 03/2007
2. HDPE (ROTATIONAL MOULDED) STORAGE TANKS FOR MAP WORKS 05/2007
3. CENTRIFUGALLY CAST CI SOIL WASTE, VENT PIPES AND FITTINGS 08/2007
4. USE OF FLUSH DOOR IN MAP 09/2007
5. FRP DOORS FOR TOILETS 10/2007
6. PROVISION OF CRADLE FOR DRYING CLOTHES IN MAP WORKS 11/2007
7. ALUMINIUM MONGERY FOR MAP WORKS 12/2007
8. KITCHEN SINK STAINLESS STEEL FOR MAP WORKS 13/2007
9. FLOOR AND WALL CERAMIC TILES 14/2007
10 RCC HUME PIPES FOR MAP WORKS 15/2007
11. CP BRASS BATHROOM FITTINGS AND OTHER ACCESSORIES
FOR MAP WORKS
16/2007
12. PVC CABLES, HT XLPE, LT, DOMESTIC, TELEPHONE WIRE AND TV CABLE FOR MAP WORKS 17/2007
13. USE OF PRECAST PCC BLOCKS IN MASONRY WORKS 18/2007
14. AMENDMENT TO POLICY ON GUIDELINES FOR USE, FORMULATING SPECIFICATIONS AND SOURCING OF
STEEL FOR MAP WORKS
26 Nov 2007

15. TRANSFORMERS FOR MAP WORKS 19/2007

16. HDPE (ROTATIONAL MOULDED) STORAGE TANKS FOR MAP WORKS 20/2007

17. PLY  BOARD  /  BLOCK  BOARD,   PRE - LAMINATED   PARTICLE BOARD, PLAIN/VENEERED PARTICLE BOARD FOR MAP WORKS 21/2007

18. CP BRASS BATHROOM FITTINGS AND OTHER ACCESSORIESFOR MAP WORKS 22/2007

19. USE OF FLUSH DOOR IN MAP 23/2007

20. MODULAR AND ORDINARY SWITCH / SOCKET, CALL BELL,MCB, ELCB, RCCB, PREWIRED MCB-DB FOR MAP WORKS 24/2007

21 .
PROVISION OF SEWAGE TREATMENT PLANTS (STPs) IN MAP
04/2007
dt 05 Mar 2007

22.
USE OF HDPE/MDPE PIPES IN MAP
01/2007
dt 01 Mar 2007

23.
USE OF uPVC PIPES IN MAP
02/2007
dt 01 Mar 2007

24 .
USE OF uPVC PIPES IN MAP
02/2007
dt 01 Mar 2007

25. USE OF uPVC PIPES IN MAP 02/2007
dt 01 Mar 2007

26. IVRS FOR MAP WORKS 06/2007
dt 29 May 2007

27 . GUIDELINES FOR USE, AMENDMENT TO POLICYON GUIDELINES FOR USE, FORMULATING SPECIFICATIONS AND SOURCING OF

STEEL FOR MAP WORKS
07/2007